| Company Information |
Yes |
No |
Comments |
| Is Co-Location a core competency? |
|
|
|
| What percentage of revenue is Co-Location? |
|
|
|
| What year was the data center completed? |
|
|
|
| Is the company financially sound? |
|
|
|
| Is the company insured? |
|
|
|
| Facilities Infrastructure |
Yes |
No |
Comments |
| Do raised floor exists? How many square
feet? |
|
|
|
| How many square feet is unoccupied? |
|
|
|
| Are open racks offered? Height? Width? |
|
|
|
| Are closed racks offered? Height? Width? |
|
|
|
| Are locked cage areas available? |
|
|
|
| Are there secured vault areas? |
|
|
|
| Are there secured configuration/repair
areas? |
|
|
|
| Are there pad sites available on the roof
for placement of antennae? |
|
|
|
| Is an elevated loading dock facility available?
|
|
|
|
| Power Systems |
Yes |
No |
Comments |
| What is the current electrical and power
system? |
|
|
|
| What is the maximum amperage provided to
the data center? |
|
|
|
| What is the maximum amperage per rack /cabinet
offered? |
|
|
|
| How many separate and diverse power source
grids? |
|
|
|
| What types of power conditioning/surge
prevention systems are deployed? |
|
|
|
| Is DC power available? |
|
|
|
| What type of UPS system is in place? |
|
|
|
| What is the current UPS size and Kva? |
|
|
|
| Current backup battery time? |
|
|
|
| Is extended generator power available and
adequate for full data centre load? |
|
|
|
| Is the generator on the premise at all
times? |
|
|
|
| Building Security |
Yes |
No |
Comments |
| Is building accessible after-hours? How? |
|
|
|
| What security system is currently in place? |
|
|
|
|
Guard?
|
|
|
|
|
Key Card?
|
|
|
|
|
Escort?
|
|
|
|
|
Door Alarms?
|
|
|
|
| Is their video surveillance recording system
in place? |
|
|
|
| Is Cabling exposed? |
|
|
|
| Is there a meet-me-room in the building? |
|
|
|
| Are agreements in place with local law
enforcement agencies? |
|
|
|
| Is response time from local law enforcement
agencies known? |
|
|
|
| What type of H.V.A.C. system? |
|
|
|
|
Water-cooled?
|
|
|
|
|
Air-cooled?
|
|
|
|
|
Chilled water?
|
|
|
|
| What is the tonnage of the system? |
|
|
|
| Is the current air conditioning system
separate from the building system? |
|
|
|
| Is a humidity control systems are in place? |
|
|
|
| Are ESD control resources in place? |
|
|
|
| Does the facility have a grounding grid? |
|
|
|
| Are there large printers that generate
paper dust or other particulate matter? |
|
|
|
| Is the H.V.A.C. system redundant? |
|
|
|
| Are equipment providers required to meet
FCC emissions standards? What class? |
|
|
|
| Fire Suppression |
Yes |
No |
Comments |
| What fire suppression system is in place? |
|
|
|
|
Wet Sprinkler?
|
|
|
|
|
Pre-Action Sprinkler?
|
|
|
|
|
FM-200?
|
|
|
|
|
Halon?
|
|
|
|
| Is the sprinkler system independent of
the building system? |
|
|
|
| Is the fire suppression redundant? |
|
|
|
| Is the fire suppression zoned? |
|
|
|
| Backbone Connection |
Yes |
No |
Comments |
| Who are the current companies providing
fiber to the building? |
|
|
|
| What service providers have fiber near
the building? |
|
|
|
| Is the building serviced with a Sonet ring
provided by the local carrier? |
|
|
|
| What is the total capacity and current
load on upstream connections? |
|
|
|
| Are policies in place for securing additional
capacity? |
|
|
|
| Are their physically redundant data path
into/out of the facility? |
|
|
|
| Is there a secondary service provider available? |
|
|
|